Parallel Lift Monopile Load-Out

One of the biggest monopile manufacturers for the renewable energy industry in Germany has taken the next step in saving money on lifting equipment. EXTREEMA® slings were chosen to equip two separate heavy lift cranes with a lifting capacity of SWL 800T each. Both cranes are being used for parallel load-out lifts or single load-out lifts of monopiles up to 1100T or heavy lift weight modules such as converter platforms. As a result of good communication and training the engineers of our customer as well as the outsourced transport company have been able to execute and finish several load-out projects in time and on budget.

 